Sunday, 6 September 2015

MANUAL WITH QUALITY CENTER CONTENTS


         AKHIL REDDY TECHNOLOGIES
        8-3-214/3/2/4, above Karachi bakery,
          Opp. Mythrivanam, Ameerpet,Hyd.


                    MANUAL TESTING


                                               SOFTWARE COMPANY
PROJECT BASED COMPANY
PRODUCT BASED COMPANY


                        SOFTWARE DEVELOPMENT LIFE CYCLE
INTIAL
PHASE
ANALYSIS
PHASE
DESIGN PHASE

CODING PHASE
TESTING PHASE
DELIVERY &MAINTENCE PHASE

INTIAL PHASE:
Þ    Tasks performed in the initial phase
Þ    Roles involved in the initial phase
Þ    Process followed in the initial phase
Þ    Outcome document of initial phase
Þ    What does BRS contain
Þ    What does FRS contain
Þ    What is template
Þ    What is prototype

ANALYSIS PHASE:

Þ    Tasks performed in the analysis phase
Þ    Roles involved in the analysis phase
Þ    Process followed in the analysis phase
Þ    Outcome document of analysis phase
Þ    What is requirement feasibility
Þ    What is technical feasibility
Þ    What do you mean by environment
Þ    How technology and environment place role in software development & using
Þ    What does SRS contain

DESIGN PHASE:
Þ    Tasks performed in the design phase
Þ    Roles involved in the design phase
Þ    Process followed in the design phase
Þ    Outcome document of design phase
Þ    What is high level designing
Þ    What is low level designing
Þ    what is UML
Þ    what is source code
Þ    who will use source code
Þ    what is the benefit of developing source code before developing actual code
Þ    what is GUI
Þ    what is the importance of GUI while using the software
Þ    what is GUI design
Þ    who will design GUI
Þ    what does TDD contain

CODING PHASE:
Þ    Tasks performed in the coding phase
Þ    Roles involved in the coding phase
Þ    Process followed in the coding n phase
Þ    Outcome document of coding phase
Þ    What do you mean by coding standards
Þ    What do u mean by code review
Þ    What is code optimization
Þ    What is fine tuning
Þ    What does source code document contain

TESTING PHASE:

Þ    Tasks performed in the testing phase
Þ    Roles involved in the testing phase
Þ    Process followed in the testing n phase
Þ    Outcome document of testing phase
Þ    What is the test summary report
Þ    What do you mean by quality product
Þ    What is test case
Þ    What is a build
Þ    What does requirement clarification note contain
Þ    What is defect profile template

DELIVERY & MAINTANENCE PHASE:

Þ    Tasks performed in the delivery & maintenance phase
Þ    Roles involved in the delivery & maintenance phase
Þ    Process followed in the delivery & maintenance phase
Þ    Outcome document of delivery & maintenance phase
Þ    What do you mean by port
Þ    What do you mean by deployment
Þ    What do you mean by normal maintenance
Þ    What do you mean by continues maintenance
Þ    Who will call onsite employees


                           SOFTWARE DEVELOPMENT MODELS
Waterfall
model
Prototype model
Evolutionary
model
Spiral
model
Fish
model
v-model
Agile
model


                                          ENVIRONMENTS
Stand alone environment
Client server environment
Web environment
Disrubuted environment


                                            TESTING
UN CONVENTIONAL TESTING
CONVENTIONAL TESTING
VARIFCATION
VALIDATION
WHITE BOX TESTING
BLOCK BOX TESTING
REVIEWS
INSPECTION
AUDIT







                                               LEVELS OF TESTING
UNIT LEVEL TESTING
MODULE LEVEL TESTING
INTGRATION LEVEL TESTING
SYSTEM LEVEL TESTING
USER ACCEPTENCE LEVEL TESTING


                              SOFTWARE TESTING LIFE CYCLE
TEST PLANNING
TEST DEVELOPMENT
TEST EXECUTION
RESULT ANALYSIS
BUG TRACKING
REPORTING

TEST PLANNING:
Þ     What is plan
Þ     What is optimization
Þ     Which feature to be tested
Þ     Which feature not to be tested
Þ     Test strategy
Þ     What is acceptance criteria
Þ     What is suspension criteria
Þ     When to stop testing
Þ     When to suspend testing
Þ     What are the test deliverables
Þ     What is test environment
Þ     What is resource planning
Þ     What is scheduling
Þ     What is staffing and training
Þ     What do you mean by risks and contingences

TEST DEVELOPMENT

Þ     What is an use case
Þ     What does FRS contain
Þ     What is high level information
Þ     What is low level information
Þ     What is importance prototype in  FRS
Þ     What is implicit requirements
Þ     What is explicit requirements
Þ     What is pre conditions
Þ     What is post conditions
Þ     What do you mean by flow of events
Þ     What are functional points
Þ     What is test scenario
Þ     What are master test cases
Þ     What are detailed test cases
Þ     What is test case template
Þ     How to write test cases in test case template
Þ     What are functional test cases
Þ     What are non functional test cases
Þ     What are test design techniques
Þ     When to use BVA
Þ     When to use ECP
Þ     What is traceability matrix
Þ     Advantages of traceability matrix

TEST EXECUTION:

Þ     What is a test bed
Þ     Build release process
Þ     What is test suite
Þ     What does SRN contains
Þ     What actually testing department receive from the development department
Þ     What is build acceptance testing


                                                             DETAILED TESTING   
FUNCTIONAL TESTING
NON FUNCTIONAL TESTING
Þ     Retesting
Þ     Regression testing
Þ     Alpha testing
Þ     Beta testing
Þ     Dynamic testing
Þ     End to end testing
Þ     Exploratory testing
Þ     Adhoc testing
Þ     System integration testing
Þ     Static testing
Þ     Usability testing
Þ     Gui testing
Þ     Port testing
Þ     Compatibility testing
Þ     Installation testing
Þ     Security testing
Þ     Monkey testing
Þ     Load testing
Þ     Reliability testing
Þ     Feature performance testing
Þ     Stress testing




BUG TRACKING & REPORTING:

Þ     What does defect profile template contain
Þ     How to write defects in the defect profile template
Þ     What is a show stopper defect
Þ     What is fatal defect
Þ     What is major defect
Þ     What is minor defect
Þ     What is suggestions
Þ     What is a bug life cycle
Þ     What is defect resolution
Þ     What are different levels of bugs
Þ     New
Þ     Open
Þ     Differed
Þ     Re-open
Þ     Closed
Þ     Fixed
Þ     Hold
Þ     As for design
Þ     Rejected
Þ     How to handle situation whenever defect is in hold
Þ     How to handle the situation whenever the defect is rejected
Þ     What is defect age
Þ     What is latent defect
Þ     Different types of reporting
Þ     What is classical bug reporting process
Þ     What is common repository oriented bug reporting process
Þ     What is bug tracking oriented bug reporting process
Þ     What is a bug tracking tool
Þ     What is common repository
Þ     What is check in
Þ     What is check out
Þ     What is test closure activity

DIFFERENT MEETINGS CONDUCTED IN THE SOFTWARE COMPANY

Þ     Review meeting
Þ     Periodic meeting
Þ     Management representation meeting
Þ     Kick of meeting
Þ     Scrum meeting
Þ      
DIFFERENT REPORTS
Þ     Minutes of meeting
Þ     Review report
Þ     Periodic project report
Þ     Daily status report
Þ     Weekly status report
Þ     Test summary report

DIFFERENT TURMS USING IN THE COMPANY DURING THE PROCESS:

Þ     Defect products
Þ     Defective products
Þ     NCR
Þ     Configuration management
Þ     Defect
Þ     Project
Þ     Product
Þ     Quality
Þ     Bidding the project
Þ     Bug
Þ     Error
Þ     Failure
Þ     CAPA
Þ     Metrics
Þ     Escalation process
Þ     Quality control
Þ     Quality assurance
Þ     Slippages
Þ     Base lining the documents
Þ     Publishing the documents
Þ     Patch
Þ     Change request
Þ     Impact analysis
Þ     Walk through
Þ     Work around


QUALITY CENTER

Test Management Using
Test Director/Quality center
           Overview on Test Management
           Architecture of TD Tool
Site Administrator
           Creating project
           Creating users
           Assigning users to projects
           Monitor Connections & Licenses Site scope
MODULES IN QUALITY CENTER
Þ    Business components
Þ    Requirements
Þ    Test plan
Þ    Test lab
Þ    Defects
Þ    Dash board

Quality Center
           Customizing Test Director
           Managing Requirements
           Creating Requirements
           Creating Test plans
           Developing Manual & Automation Tests
           Coverage analysis/Traceability
           Create test sets
           Running tests
           Record results
           Defect reporting & tracking
           Integration with WR & QTP
Test Management
           Developing reports
           Developing graphs

RESUME PREPARATION
REAL TIME PROJECT EXPLANATION

9440592994, 8885592994
            040-40032994
        www.akhilreddy.com

No comments:

Post a Comment