AKHIL REDDY TECHNOLOGIES
8-3-214/3/2/4, above Karachi bakery,
Opp. Mythrivanam, Ameerpet,Hyd.
MANUAL TESTING
SOFTWARE COMPANY
|
|
PROJECT BASED COMPANY
|
PRODUCT BASED COMPANY
|
SOFTWARE DEVELOPMENT LIFE CYCLE
|
|||||
INTIAL
PHASE
|
ANALYSIS
PHASE
|
DESIGN PHASE
|
CODING PHASE
|
TESTING PHASE
|
DELIVERY &MAINTENCE PHASE
|
INTIAL PHASE:
Þ
Tasks performed in the
initial phase
Þ
Roles involved in the
initial phase
Þ
Process followed in
the initial phase
Þ
Outcome document of
initial phase
Þ
What does BRS contain
Þ
What does FRS contain
Þ
What is template
Þ
What is prototype
ANALYSIS PHASE:
Þ
Tasks performed in the
analysis phase
Þ
Roles involved in the analysis phase
Þ
Process followed in
the analysis phase
Þ
Outcome document of analysis phase
Þ
What is requirement
feasibility
Þ
What is technical
feasibility
Þ
What do you mean by
environment
Þ
How technology and
environment place role in software development & using
Þ
What does SRS contain
DESIGN PHASE:
Þ
Tasks performed in the
design phase
Þ
Roles involved in the design phase
Þ
Process followed in
the design phase
Þ
Outcome document of design phase
Þ
What is high level
designing
Þ
What is low level
designing
Þ
what is UML
Þ
what is source code
Þ
who will use source code
Þ
what is the benefit of developing source code
before developing actual code
Þ
what is GUI
Þ
what is the importance of GUI while using the
software
Þ
what is GUI design
Þ
who will design GUI
Þ
what does TDD contain
CODING PHASE:
Þ
Tasks performed in the
coding phase
Þ
Roles involved in the coding phase
Þ
Process followed in
the coding n phase
Þ
Outcome document of coding phase
Þ
What do you mean by
coding standards
Þ
What do u mean by code
review
Þ
What is code
optimization
Þ
What is fine tuning
Þ
What does source code
document contain
TESTING PHASE:
Þ
Tasks performed in the
testing phase
Þ
Roles involved in the
testing phase
Þ
Process followed in
the testing n phase
Þ
Outcome document of
testing phase
Þ
What is the test
summary report
Þ
What do you mean by
quality product
Þ
What is test case
Þ
What is a build
Þ
What does requirement
clarification note contain
Þ
What is defect profile
template
DELIVERY & MAINTANENCE PHASE:
Þ
Tasks performed in the
delivery & maintenance phase
Þ
Roles involved in the delivery
& maintenance phase
Þ
Process followed in
the delivery & maintenance phase
Þ
Outcome document of delivery
& maintenance phase
Þ
What do you mean by
port
Þ
What do you mean by
deployment
Þ
What do you mean by
normal maintenance
Þ
What do you mean by
continues maintenance
Þ
Who will call onsite
employees
SOFTWARE
DEVELOPMENT MODELS
|
||||||
Waterfall
model
|
Prototype model
|
Evolutionary
model
|
Spiral
model
|
Fish
model
|
v-model
|
Agile
model
|
ENVIRONMENTS
|
|||
Stand alone environment
|
Client server environment
|
Web environment
|
Disrubuted environment
|
TESTING
|
||||
UN CONVENTIONAL TESTING
|
CONVENTIONAL TESTING
|
|||
VARIFCATION
|
VALIDATION
|
|||
WHITE BOX TESTING
|
BLOCK BOX TESTING
|
REVIEWS
|
INSPECTION
|
AUDIT
|
LEVELS OF
TESTING
|
||||
UNIT LEVEL TESTING
|
MODULE LEVEL TESTING
|
INTGRATION LEVEL TESTING
|
SYSTEM LEVEL TESTING
|
USER ACCEPTENCE LEVEL TESTING
|
SOFTWARE
TESTING LIFE CYCLE
|
|||||
TEST PLANNING
|
TEST DEVELOPMENT
|
TEST EXECUTION
|
RESULT ANALYSIS
|
BUG TRACKING
|
REPORTING
|
TEST PLANNING:
Þ
What is plan
Þ
What is
optimization
Þ
Which feature to
be tested
Þ
Which feature not
to be tested
Þ
Test strategy
Þ
What is
acceptance criteria
Þ
What is
suspension criteria
Þ
When to stop
testing
Þ
When to suspend
testing
Þ
What are the test
deliverables
Þ
What is test
environment
Þ
What is resource
planning
Þ
What is
scheduling
Þ
What is staffing
and training
Þ
What do you mean
by risks and contingences
TEST DEVELOPMENT
Þ
What is an use
case
Þ
What does FRS
contain
Þ
What is high
level information
Þ
What is low level
information
Þ
What is
importance prototype in FRS
Þ
What is implicit
requirements
Þ
What is explicit
requirements
Þ
What is pre
conditions
Þ
What is post
conditions
Þ
What do you mean
by flow of events
Þ
What are
functional points
Þ
What is test
scenario
Þ
What are master
test cases
Þ
What are detailed
test cases
Þ
What is test case
template
Þ
How to write test
cases in test case template
Þ
What are
functional test cases
Þ
What are non
functional test cases
Þ
What are test
design techniques
Þ
When to use BVA
Þ
When to use ECP
Þ
What is
traceability matrix
Þ
Advantages of
traceability matrix
TEST EXECUTION:
Þ
What is a test
bed
Þ
Build release
process
Þ
What is test
suite
Þ
What does SRN
contains
Þ
What actually
testing department receive from the development department
Þ
What is build
acceptance testing
DETAILED TESTING
|
|
FUNCTIONAL TESTING
|
NON FUNCTIONAL TESTING
|
Þ
Retesting
Þ
Regression
testing
Þ
Alpha testing
Þ
Beta testing
Þ
Dynamic testing
Þ
End to end
testing
Þ
Exploratory
testing
Þ
Adhoc testing
Þ
System
integration testing
|
Þ
Static testing
Þ
Usability
testing
Þ
Gui testing
Þ
Port testing
Þ
Compatibility
testing
Þ
Installation
testing
Þ
Security
testing
Þ
Monkey testing
Þ
Load testing
Þ
Reliability
testing
Þ
Feature
performance testing
Þ
Stress testing
|
BUG TRACKING & REPORTING:
Þ
What does defect
profile template contain
Þ
How to write
defects in the defect profile template
Þ
What is a show
stopper defect
Þ
What is fatal
defect
Þ
What is major
defect
Þ
What is minor
defect
Þ
What is suggestions
Þ
What is a bug
life cycle
Þ
What is defect
resolution
Þ
What are
different levels of bugs
Þ
New
Þ
Open
Þ
Differed
Þ
Re-open
Þ
Closed
Þ
Fixed
Þ
Hold
Þ
As for design
Þ
Rejected
Þ
How to handle situation
whenever defect is in hold
Þ
How to handle the
situation whenever the defect is rejected
Þ
What is defect
age
Þ
What is latent
defect
Þ
Different types
of reporting
Þ
What is classical
bug reporting process
Þ
What is common
repository oriented bug reporting process
Þ
What is bug
tracking oriented bug reporting process
Þ
What is a bug
tracking tool
Þ
What is common
repository
Þ
What is check in
Þ
What is check out
Þ
What is test
closure activity
DIFFERENT MEETINGS
CONDUCTED IN THE SOFTWARE COMPANY
Þ Review meeting
Þ Periodic meeting
Þ Management representation meeting
Þ Kick of meeting
Þ Scrum meeting
Þ
DIFFERENT REPORTS
Þ Minutes of meeting
Þ Review report
Þ Periodic project report
Þ Daily status report
Þ Weekly status report
Þ Test summary report
DIFFERENT TURMS USING IN THE COMPANY DURING THE PROCESS:
Þ Defect products
Þ Defective products
Þ NCR
Þ Configuration management
Þ Defect
Þ Project
Þ Product
Þ Quality
Þ Bidding the project
Þ Bug
Þ Error
Þ Failure
Þ CAPA
Þ Metrics
Þ Escalation process
Þ Quality control
Þ Quality assurance
Þ Slippages
Þ Base lining the documents
Þ Publishing the documents
Þ Patch
Þ Change request
Þ Impact analysis
Þ Walk through
Þ Work around
QUALITY
CENTER
Test Management Using
Test Director/Quality center
• Overview on
Test Management
• Architecture
of TD Tool
Site Administrator
• Creating
project
• Creating
users
• Assigning
users to projects
• Monitor
Connections & Licenses Site scope
MODULES IN QUALITY
CENTER
Þ
Business components
Þ
Requirements
Þ
Test plan
Þ
Test lab
Þ
Defects
Þ
Dash board
Quality
Center
• Customizing
Test Director
• Managing
Requirements
• Creating
Requirements
• Creating
Test plans
• Developing
Manual & Automation Tests
• Coverage
analysis/Traceability
• Create test
sets
• Running
tests
• Record
results
• Defect
reporting & tracking
• Integration
with WR & QTP
Test Management
• Developing
reports
• Developing
graphs
RESUME PREPARATION
REAL TIME PROJECT
EXPLANATION
9440592994, 8885592994
040-40032994
www.akhilreddy.com
No comments:
Post a Comment