Acceptance
Checklist
The following checklist is
intended to provide system owners, project managers, and other information
system development and maintenance professionals with guidance in identifying
and planning information system acceptance activities. The checklist reflects recognized acceptance
management activities to be performed throughout the information systems
project lifecycle.
Information systems
acceptance is generally characterized as a process to officially accept new or
modified software components, which, when integrated, form an information
system.
Within this context, the
objectives of software acceptance are summarized as the following:
C
Verify that the
software product meets users= requirements
and is fully operational.
C
Obtain the system
owner=s acceptance and approval of the software product.
C
Transfer
responsibility of the system from the project team to the system owner and
support staff.
Acceptance Checklist
|
SEM Reference
|
Comments
|
User Training has
been conducted.
|
Chapter 9
Perform
Installation Activities Conduct User Training
|
|
If a current system
exists, the system and data conversion has been performed in accordance with
the Conversion Plan.
|
Chapter 9
Perform
Installation Activities
|
|
At each installation
site, the facility has been inspected to assure that the site preparation is
complete and in accordance with the Installation Plan.
|
Chapter 9
Perform
Installation Activities
|
|
The installation has
been coordinated with the system owner, operations staff, support staff, and
other affected organizations.
|
Chapter 9
Perform
Installation Activities
|
|
Any necessary
modifications to the physical installation environment are complete.
|
Chapter 9
Perform
Installation Activities
|
|
The hardware has been
inventoried and tested.
|
Chapter 9
Perform
Installation Activities
|
|
If the software
product requires an initial data load or data conversion, the tested programs
are installed and executed.
|
Chapter 9
Perform
Installation Activities
|
|
The software product
has been installed on the hardware platform and tested according to the
Installation Plan.
|
Chapter 9
Perform Installation
Activities
Conduct
Installation Tests
|
|
Problems and
corrective action are documented.
|
Chapter 9
Conduct
Installation Tests
|
|
All
equipment and software was retested after a repair, replacement, or
modification.
|
Chapter 9
Conduct
Installation Tests
|
|
A copy
of all installation test materials has be placed in the project file.
|
Chapter 9
Conduct
Installation Tests
|
|
A copy of training
materials have been submitted to the system owner and user for review and
approval and are placed under configuration management.
|
Chapter 9
Conduct User Training
|
|
The test environment
is subject to strict, formal configuration control to maintain the stability
of the environment and to assure the validity of all tests.
|
Chapter 9
Conduct Acceptance Test
|
|
All acceptance test
activities have been coordinated with the system owner, user(s), operations
staff and other affected organizations.
|
Chapter 9
Conduct Acceptance Test
|
|
Acceptance Testing has
been conducted in the production environment using acceptance test data and
test procedures established in the Acceptance Test Plan
|
Chapter 9
Conduct Acceptance Test
|
|
All tests have been
executed correctly.
|
Chapter 9
Conduct Acceptance Test
|
|
Any tests that failed
have been documented, corrected, and re-tested.
|
Chapter 9
Conduct Acceptance Test
|
|
An Acceptance Test
Report has been created
|
Chapter 9
Conduct Acceptance Test
|
|
A copy of all
acceptance test materials has been placed in the project file.
|
Chapter 9
Conduct Acceptance Test
|
|
At the completion of
acceptance testing, an Operational Readiness Review, which includes a
physical configuration audit, is conducted.
|
Chapter 9
Conduct Acceptance Test
|
|
If the operational
product required enhancements or changes to correct problems, each new
release was preceded by an Operational Readiness Review.
|
Chapter 9
Conduct Acceptance Test
|
|
After successful
completion of all Operational Readiness Reviews, the updated system
documentation was established as a new baseline.
|
Chapter 9
Conduct Acceptance Test
|
|
Complete operating
documentation describing the product has been approved and delivered.
|
Chapter 9
Conclude Acceptance Process
|
|
This acceptance
checklist is completed and contains a concurrence signature of the system
owner (if required).
|
Chapter 9
Conclude Acceptance Process
|
|
A formal written
acceptance of the software product is produced by the system owner to verify
that the software product is accepted and ready for production.
|
Chapter 9
Conclude Acceptance Process
|
|
The software product
is transitioned to full operational status according to the Transition Plan.
|
Chapter 9
Transition to Operational Status
|
|
Stress and other
operational tests have been conducted.
|
Chapter 9
Transition to Operational Status
|
|
Any training and certification
activities are completed.
|
Chapter 9
Transition to Operational Status
|
|
Ensure
that maintenance support begins as planned.
|
Chapter 9
Transition to Operational Status
|
|
At end of transition
period, a formal transfer of all responsibilities to the support staff is
conducted.
|
Chapter 9
Transition to Operational Status
|
|
For major software
systems involving multiple organizations and interfaces with other systems, a
formal announcement of the transition to production has been done.
|
Chapter 9
Transition to Operational Status
|
|
Access rules have been
modified to provide access to the system by the support staff and remove
project team and other temporary user access from further access to the
system
|
Chapter 9
Transition to Operational Status
|
|
A list of any planned
enhancements have been provided to the support staff.
|
Chapter 9
Transition to Operational Status
|
|
Programs, files, and
other support software are in the production library and have been deleted
from the test library, where appropriate.
|
Chapter 9
Transition to Operational Status
|
|
All project file
materials, operating documents, and other pertinent records have been turned
over to the maintenance staff
|
Chapter 9
Revise Project plan
|
|
The Project Plan has
been updated to include any revised estimates of resources, cost, and
schedule.
|
Chapter 9
Revise Project plan
|
|
Conduct a structured
walkthrough to ensure Project plan reflects the project=s current status and adequately estimates the
resources, costs, and schedule for the maintenance stage.
|
Chapter 9
Revise Project plan
|
REFERENCES
The
following resources can be referenced for additional information on system
acceptance practices and procedures.
DOE Systems Engineering Methodology, September 2002
Institute of Electrical and Electronic Engineers
(IEEE)
The
IEEE Standard for Software Life Cycle Processes
Organization for Standardization (ISO) ISO 9001
Inroads to Software Quality AHow-to Guide and Tool Kit@ by Alka
Jarvis and Vern Crandall, Prentice Hall, 1997