Ø
TERMINOLOGY
1. Defect
products: if at all the product is not justifying some of the requirements but
it is still usable, Then such type of product known as defect products.
2. Defective
products: if at all the product is not justifying some of the requirements as
well as it is not usable then such type of product known as defective products.
3. Quality
Assurance: QA is a department which checks each & every role in the
organization in order to conform whether they are doing their work according to
company process guide lines or not.
4. Quality
Control: QC is a department which checks the developed products or its related
parts in order to conform whether they are working according to the
expectations or not.
5. NCR(Non
Conformance Rate): Non conformance raised
is a whenever the role is not following the process then the penalty
given for him is known as NCR.
6. Inspection:
It is a process of sudden checking conducted on the roles or departments
without any prior intimation.
7. Audit:
it is a process of checking conducted on the roles and department with prior
intimation well in advance.
i.
Internal audit: if at all audit is
conducted by the internal resource of the organization then it is known as
internal audit.
ii.
External audit: if at all audit is
conducted by the external people then it is known as external audit.
8. CAPA(Corrective
Actions Preventive Action):
CA: if
at all the role has come to a reparable situation then CA will be taking care
in order to connect the mistake.
PA:
whenever roles come its irreparable mistake then the preview the action should
taking care in order to prevent such type of mistakes in future.
9. SCM (S/w Configuration Management): Configuration management is a process
in which one will mainly prefer two
tasks
i. Change
Control: it is a process of updating all the related documents
whenever
some changes are made to the application in order to keep the documents and the
application in sink with each other.
ii. Version
Control: it is a process of maintaining the naming conventions & version
numbers.
Ex: HMS
- Adml _ TC 001 à 1.0
10. Common Repository:CR is a
basically a server which can access by only authorized
People where in they can store the
information & require the information.
àCheck in is a process of uploading in the information
into common repository.
àCheck out is a process of
downloading the information from the common
repository.
Ex: VSS(Visual Source
Safe)
CVS(Concurrent
version system)
11. Baseline: it is a process
of finalizing the document.
12. Publishing: It is a process
of making the finalized documents available to the relevant resource by
uploading them into CR with special icon representation.
13. Release: It is a process of
sending the application from the development department to the testing
department or from the company to the market.
14. Delivery: it is a process
of handover the application from the company to the client or from the market
to the client.
15. SRN (S/w Released Note): it
is not prepared by the technical department & sent to the testing
department contains of the following information
1. Build path information
2. Test Date PI
3. Deployment document PI
4. Known issues PI
5. Released manager name
6. Released date
7. Build Number
8. Vesrion number
9. Project name
10. Module name etc..,
16. SDN(S/w delivery Note): it
is a document which contains the following information
i. user manual
ii. Known issues
it is a prepared by the team
of members under the project manager guidance
& will given to the customer during the delivery.
17. Review: it is defined as in the process of studying
or process of cheating depending upon the role involved in it.
18. Review report: it is an outcome document of review which may
contain either list of doubles or list of comments depending upon the involved
in it.
19. Peer – review: it is a process of checking conducted by the
colleagues at the same level.
20. Peer- review report: it an outcome document of peer review which
contains the list of all the comments given during the peer-review.
21. Slip age: the extra time to
accomplish a task is known as slippage.
22. Escalation: it is a process
of intimating the issue related information to the next level of authorities
usually if will be done level by level.
23. Metrics: it is defined as clear measurement of task.
24. Traceability Matrix: it is a document which contains a table of
linking information used for tracing back for the reference in any kind of
confusion or Questionable situation.
25. Prototype: it is a roughly & rapidly developed model
which is used for demonist rating to the client in order gather the clear
requirements & also to win the confidence of a customers.
26. Benchmark: it is a defined as the standard it which
usually we compared.
27. Change Request: it is a
process of requesting the changes by the customers to the company to do the
same usually the customer use change request document.
Ex: change request template
28. Impact Analysis: it is
processes of analysis how much impact will fall on the already developed part
if at all accept those new changes at that point of time.
29. Test suite: it is a
combination of different types of test cases.
Ex: i. regress test case ii. Retest test case
30. Test Bed: it is a
combination of test suite & test environment
31. Defect age: the time gap
between the opening date & the closing date is known as defect age.
32. Latent Defect: the defect found date after some releases is
known as a latent defect.
33. Walkthrough: it is defined
as informal meeting conducted with the roles either transfer the knowledge or
to check something.
34. Code walkthrough: it is a process of checking conducted on the
source code document in order to conform whether it is developed according to
the coding standards or not.
35. Code Optimization or fine
tuning: it is a process of reading the
no.of lines of code or the complexity in the code in order to increase the
performance of the application.
36. PPM(periodic project meeting): it is a meeting conducted periodically in
order to discuss the status of the project usually they discuss the following
points.
1. % covered in the project during
period
2. % not covered in the project during
the period
3. tasks completed during the period
4. total defects metrics
5. Slippages
6. Reasons for the slippages
7. Technical issues
8. HR related issues
37. PPR (Periodic project
report): it is a report prepared by the
team lead before the PPM is conducted by discussing with all of his team
members related to all of the above said points.
38. MOM (Minutes of
meeting): MOM is a the outcome document
of any meeting which contains the list of all the important points discussed
during that meeting.
39. MRM (Management
representation meeting): it is meeting
conducted in order to discuss the status of the company. Usually they discus
the following points
1. success rate & growth rate of the
company
2. projects that are recently signed off
3. projects that are in a pipeline
4. customers appraisals
5. customers negative comments
6. Future plans
7. internal audit reports
8. Individual appraisals
40. Patch: whenever the test
engineer suspends the build then the developers will rectify the problems &
release the same build as patch.
Cross
Reference Document (or) (Traceability Document);
It is a
document, which contains a table of linking information used for tracing back
for the reference whenever there is a questionable situation.
VLD
|
FPD
|
MTCD
|
![]()
DTCD DPD
|
2
8
|
7
22
|
3
5
|
28 1
5
47
|
Common Traceability Matrix
Requirement
Traceability Matrix
TCID
|
REQ
ID
|
1
2
3
4
5
6
7
8
|
1
1
1
2
2
2
2
2
|
Defects Traceability
Document
DID
|
TCID
|
1
2
3
4
5
6
|
28
32
65
96
48
52
|
No comments:
Post a Comment